Flexible capacity and Professional Display Terminal delivery line

Flexible Capacity Delivery

From prototype validation to batch delivery, REASEED uses its in-house manufacturing system and flexible capacity planning to support faster delivery, optimized cost, and stable quality.

3000+Monthly capacity
1 unitMOQ support
10 daysRapid prototyping
4 stepsDelivery loop

Small-batch customization and volume production support

Meeting different project stages, from pilot runs and product validation to scaled deployment.

Three Production Lines Working Together

Covering module assembly, final assembly, testing, and aging to provide stable capacity for orders of different scales.

Clean assembly workshop for display modules

Module Workshop

300 units / day
Professional Display Terminal final assembly line 1

Final Assembly Line 1

200 units / day
Professional Display Terminal final assembly line 2

Final Assembly Line 2

200 units / day

MOQ from One Unit, with Support for Orders of Different Sizes

Supporting small-batch customization, mid-volume delivery, and large-scale project production to match customer needs at different stages.

Small-batch pilot assembly for display terminals01

Small-Batch Pilot Run

Suitable for project validation, prototype testing, and solution confirmation.

Mid-volume delivery of rail transit display terminals02

Mid-Volume Delivery

Designed for regional deployment, phased construction, and project pilots.

Display terminal racks for volume production03

Volume Production

Supporting rapid scheduling and centralized delivery for industry projects.

From Requirement to Prototype in as Fast as 10 Days

A standardized project response process shortens communication, solution design, and sampling cycles to improve implementation efficiency.

1 dayRequirement alignmentRequirement alignment completed in one day
3 daysSolution proposalSolution proposal in three days
10 daysRapid prototypingRapid prototype assembly and testing in ten days
BatchProduction scheduling and deliveryBatchProduction scheduling and delivery

One-Stop Delivery from Manufacturing to Implementation

From in-house manufacturing and logistics to on-site installation, commissioning, acceptance, and training, REASEED provides a complete project delivery loop.

01

In-House Manufacturing

Key processes are controlled in-house to reduce total project cost.

In-house display terminal assembly
02

Logistics Delivery

Shipment and delivery are arranged according to project milestones.

Logistics loading and shipment
03

On-Site Installation and Commissioning

Supporting on-site deployment, joint debugging, and operation confirmation.

On-site installation and commissioning of display systems
04

Acceptance and Training

Assisting customers with acceptance, handover, and user training.

Acceptance and training handover

Lower Cost, Faster Delivery, More Stable Quality

Cost Advantage

The in-house manufacturing system helps reduce overall procurement cost.

In-house manufacturing reduces total cost

Delivery Advantage

Flexible capacity supports rapid response to project requirements.

Logistics delivery improves delivery efficiency

Quality Advantage

Full-process quality control helps ensure stable and reliable products.

Testing and prototyping support product quality

Contact Us

Building B, Konka Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen yishi@reaseed.com (0755)2698 1890
REASEED office building REASEED location map